SEARCH YOUR QUERY

Monday, July 5, 2021

Q Bank on Building materials for Civil Engineering LDC Exam MCQ

1.Stone generally preferred for railway ballast is
a) Sandstone
b) Dolomite
c) Marble
d) Basalt or trap granite
Answer - d) Basalt or trap granite

2. An artificial stone made from pieces of white marble, white cement and other coloring agents, generally used for floor and facing walls is known as
a) Topaz
b) Marble
c) Terrazzo
d) Gneiss
Answer - c) Terrazzo

3. Which one of the following impurity is not desirable in the soil used for brick formation
a) Alkali 
b) Kankar
c) Iron oxide 
 d) Alkali & Kankar
Answer -  d) Alkali & Kankar

4. The Rocks formed from molten lava are called 
a) Sedimentary rocks
b) Igneous rocks
c) Metamorphic rock
d) Plutonic rock 
Answer - b) Igneous rocks

5. Granite is obtained from
a) Igneous rocks
b) Sedimentary rocks
c) Metamorphic rocks
d) Plutonic rock 
Answer - a) Igneous rocks

6. Marble is obtained from
a) Igneous rocks
b) Sedimentary rocks
c) Metamorphic rocks
d) Plutonic rock 
Answer - c) Metamorphic rocks

7. Limestone is obtained from
a) Igneous rocks
b) Sedimentary rocks
c) Metamorphic rocks
d) Plutonic rock 
Answer - b) Sedimentary rocks

8. The bulking of sand with 2% moisture content is about
a) 5%
b) 10%
c) 15%* 
d) 20% 
Answer - c) 15%

9. A good building stone should not absorb water more than 
a) 5%
b) 10%
c) 15%
d) 20%
Answer - a) 5%

10. The standard size of modular bricks is------------- centimeters
a) 18x 8 x8 
b) 19x 9x 9 
c) 20x 10 x10
d) 21x 11 x11
Answer - d) 21x 11 x11

11. The Frog of a brick is normally made on its
a) Top face
b) Bottom face
c) Longer face
d) Shorter side
Answer - a) Top face

12. The minimum compressive strength of first class brick should be 
a) 75 kg per centimeter square
b) 90 kg per centimeter square
c) 100 kg per centimeter square
d) 120 kg per centimeter square
Answer -c) 100 kg per centimeter square
 
13. If first class Brick is immersed in water for 24 hours it should not absorb water by weight more than 
a) 10% 
b) 15% 
c) 20% 
d) 25%
Answer - c) 20% 

14. A pug mill is used for
a) Softening brick earth
b) Moulding brick earth 
 c) Tempering brick earth
d) Compacting brick earth 
Answer -  c) Tempering brick earth

15. Minimum crushing strength of the bricks is
a) 35 kg/cm2 
b) 55 kg/m2 
c) 70 kg/m2 
d) 105 kg/m2 
Answer - b) 55 kg/m2 

16. Normal size of brick used in India is
a) 22 x 11.2 x 7 cm
b) 25 x 16 x 8 cm 
 c) 19 x 12 x 9 cm 
d) 20 x 10 x 5 cm
Answer - a) 22 x 11.2 x 7 cm

17. The depth of frog in a brick is 
a) 15 mm
b) 10 mm
c) 6. 25 mm
d) 3 mm
Answer - c) 6. 25 mm

18. The base material for distemper is
a) Chalk
b) Lime
c) Lime putty
d) Cement wash
Answer -  a) Chalk 

19. Timber having maximum resistance against white ants is obtained from
a) Chir
b) Sheesham 
c) Sal 
d) Teak
Answer - d) Teak

20. Linseed oil is used in Paints as a
a) Vehicle
b) Base
c) Drier*
d) Thinner
Answer - c) Drier

21. The lime which contains mainly calcium oxide and slacks with water, is known as
a) Fat lime
b) Quicklime
 c) Hydraulic lime 
 d) Poor line
Answer - b) Quicklime

22. The property by virtue of which lime sets under water is known as 
a) Slacking
b) Setting
c) Hydraulicity
d) Calcining 
Answer - d) Calcining 

23. Which of the following lime can set under water also 
a) Fat Lime
b) Lean lime
c) Hydraulic line
d) Quick lime 
Answer - b) Lean lime

24. Granite is not suitable for ordinary building purpose because
a) It cannot be polished
b) It is not fireproof
c) It is costly
d) It has less crushing strength
Answer - c) It is costly

25. Which of the following stone is best suited for construction of piers and abutments of Railway Bridge
a) Granite
b) Sandstone
c) Limestone
d) Quartzite
Answer - a) Granite

26. Which of the following trees yields hardwood 
a) Deodar
b) Sheesham
c) Chir
d) Pine 
Answer - b) Sheesham

27. In which of the following directions, the strength of timber is maximum 
a) Parallel to grains
b) 45 degree to grains
c) Perpendicular to grains
d) same in all directions
Answer - a) Parallel to grains

28. Which of the following ingredients of Brick earth enables the brick to retain its shape 
a) Alumina
b) Silica
c) Iron
d) Magnesia
Answer - b) Silica

29. Number of bricks required for 1 cubic meter of brick masonry is 
a)400
b) 450 
c) 500 
d) 550 
Answer - c) 500

30. Quicklime is
a) Calcium carbonate 
b) Calcium bicarbonate 
c) Calcium oxide
d) Calcium hydroxide
Answer - c) Calcium oxide

31. The main ingredients of Portland cement are
a) Lime and silica
b) Lime and Alumina
c) Alumina magnesia
d) Silica and Alumina
Answer - a) Lime and silica

32. After storage, strength of cement
a) Decreases
b) Increases
c) Remains same
d) Depends upon the type of cement
Answer - a) Decreases

33. The Most common admixture used to accelerate the initial setting of concrete is 
a) Gypsum 
b) Calcium chloride
c) Calcium carbonate
d) Calcium bicarbonate
Answer - b) Calcium chloride

34. Which type of following cement is used for mass concrete work 
a) High Alumina cement 
b) Quick setting cement
c) Rapid hardening cement
d) Low heat cement
Answer - d) Low heat cement

35. Le Chatelier apparatus is used to determine which of the following properties for cement
A) Soundness
b) Initial setting time
c) Compressive strength
d) Tensile strength
Answer - A) Soundness

36. Which of the following constituents impart plasticity to brick earth
a) Alumina
b) Silica 
c) Lime
d) Magnesia
Answer - a) Alumina

37. Hydraulic lime is not used in plastering because it may result in
a) Blistering
b) Efflorescence
c) Flaking 
d) Fluorescence 
Answer - a) Blistering

38. Seasoning of timber essentially involve
a) Strengthening of cells in Timber 
b) Replacing the moisture content to a level below its fibre saturation point 
c) Facilitating equal shrinkage in all directions so as to prevent warping
d) Preventing cracking due to defects and shakes 
Answer -  c) Facilitating equal shrinkage in all directions so as to prevent warping

39. The commonly used lime in white washing is 
a) Hydraulic lime
b) Slaked lime
c) Plain lime 
 d) White lime
Answer -  d) White lime

40. Distemper is used to coat
a) External concrete services 
b) Internal surfaces not exposed to weather
c) Woodwork
d) Compound walls
Answer -  b) Internal surfaces not exposed to weather

41. Putty is made up of
a) White lead and turpentine 
b) Powdered chalk and raw linseed oil
c) Red lead and linseed oil
d) Zinc oxide and boiled linseed oil 
Answer - b) Powdered chalk and raw linseed oil

42. The approximate ratio between the strength of cement concrete at seven days and 28 days is
a) 3/ 4
b) 2/3
c) 1/2
d) 1/3
Answer - b) 2/3

43. Soundness test of cement is done to determine its 
 a) Durability in seawater
b) Free lime content
c) Iron oxide content
d) Alumina content
Answer - b) Free lime content

44. The volume of a bag of cement in cubic meters is about
a) 0.035
b) 0.35 
c) 0.53
d) .053 
Answer - a) 0.035

45. Terracotta is used in buildings for 
a) Storage 
b) Insulation 
c) Ornamental work
d) Sewer pipe
Answer - c) Ornamental work

46. Sand is mixed with lime to 
a) Reduced cost
b) Reduced setting time
c) Prevent shrinkage and cracking
d) Improve visual appearance
Answer - c) Prevent shrinkage and cracking

47. The setting and hardening of cement after addition of water is due to 
a) Binding action of water
b) Evaporation of water
c) Hydration and hydrolysis of some constituent compounds of cement* 
d) Additional hardening compounds added to cement 
Answer - c) Hydration and hydrolysis of some constituent compounds of cement 


48. The constituent of cement which act as Binders are
a) Sand and silica
b) Silica and carbon 
c) tricalcium silicate dicalcium silicate and carbon
d) tricalcium aluminate,dicalcium silicate and tricalcium silicate 
Answer - d) tricalcium aluminate,dicalcium silicate and tricalcium silicate 

50. A slow setting cement will have higher percentage of
a) tricalcium aluminate
b) tricalcium silicate
c) Gypsum
d) Dicalcium silicate
Answer - d) Dicalcium silicate

51. Dicalcium silicate 
a) Hydrates rapidly
b) Generate less heat of hydration
c) Hardens rapidly
d) Reacts with water only
Answer - b) Generate less heat of hydration

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.

Disclaimer: The Information/News/Video provided in this Platform has been collected from different sources. We Believe that “Knowledge Is Power” and our aim is to create general awareness among people and make them powerful through easily accessible Information. NOTE: We do not take any responsibility of authenticity of Information/News/Videos.

Index -

01. INTEGRATED CONCEPT AND OBJECTIVES OF MATERIALS MANAGEMENT (1) 01.02 रेलपथ निरक्षक तथा सहायक मंडल अभियंता के कर्तव्य (1) 02 रेलपथ (1) 02. ORGANIZATION OF MATERIALS MANAGEMENT DEPARTMENT (1) 02.01 90 यूटीएस रेलों के सम्भाल (1) 02.04 रेल तापमान (1) 02.05 रेल जोड (1) 03 स्लीपरो के कार्य (1) 03. CLASSIFICATION/CODIFICATION NOMENCLATURE OF STORES ON INDIAN RAILWAYS (1) 03.01 विभिन्न प्रकार के स्लीपरो की तुलना (1) 03.02 लचीले बंधन (1) 03.03 स्लीपर बिछाना (1) 04. PLANNING OF NON-STOCK ITEMS AND PROCESSING OF REQUISITION (1) 04.01 ट्रैक के लिए बैलास्ट प्रोफाइल (1) 04.02 फार्मेशन (1) 04.03 ब्रिज (पुल) (1) 05 पाइंट्स तथा क्रासिंग - परिचय एवं परिभाषाए (1) 05 PLANNING OF STOCK ITEMS & SYSTEMS OF RECOUPMENT (1) 05.01 विषेश ले आउट (1) 05.02 पृथक्रकरण (आइसोलेशन ) (1) 05.03 तथा क्रासिंग का अनुरक्षण तथा निरक्षण (1) 05.04 पॉइंट्स एवं क्रासिंग की (1) 06 गोलाई का प्ररंभिक ज्ञान (1) 06 PURCHASE POLICY (1) 06.01 वर्को का पुनः संरेखण (1) 07 Purchase Procedure on zonal Railways (1) 08 TENDER EVALUATION AND MISCELLANEOUS POLICY ISSUES IN PURCHASES (1) 08.01 व्यव्स्तिथ ओवरहालिंग (1) 08.02 रेलपथ अनुरक्षण का वार्षिक कार्यक्रम (1) 08.04 गहरी छनाई (1) 08.04.1 रेलपथ का उठाना लोवेरिंग तथा क्रीप (1) 08.05 छोटी वेल्डेड रेल ( एसडब्लूआर ) (1) 08.06 आन ट्रैक मशीन (1) 08.07 छोटी ट्रैक मशीने (1) 08.09 विद्युतीकृत सेक्शन में हाइट गेज (1) 08.11 अंडर ट्रायल सामग्री का रिकॉर्ड (1) 09 गति प्रतिबन्ध और संकेतक (1) 09 Receipt And Inspection of stores (1) 09.01 ठेकेदार की सुरक्षित कार्य प्रणाली (1) 09.03 रेल संरक्षा आयुक्त की स्वीकृति वाले कार्य (1) 10 निरक्षण का उद्देश्य (1) 10 ISSUE AND DISTRIBUTION OF STORES (1) 10.01 राइडिंग गुणवत्ता तथा राइडिंग इंडेक्स (1) 10.03 सिटीआर तथा टीजीआई (1) 10.04 रेलपथ प्रबंधन पध्दति (टीऍमएस ) (1) 11 RETURNED STORES (1) 11.01 स्लीपरो का बिछाना (1) 12 दुर्घटना (1) 12 Scrap Disposal (1) 12.01 ब्रीच (1) 12.02 डाईवर्शन (1) 13 INVENTORY MANAGEMENT (1) 14 लंबी वेल्डित रेल (परिभाषाए) (1) 14.01 एलडब्लूआर / सीडब्लूआरके लिये स्वीकृत स्थान (1) 14.02 एलडब्लूआरकी डीस्ट्रेसिंग (1) 14.03 एलडब्लूआर / सीडब्लूआर का अनुरक्षण (1) 14.04 रेलपथ पर्येवेक्षक - मेट तथा चाबीदार के लिए अनुमत तथा निषिद्ध कार्य (1) 15 - सर्वेक्षण (1) 15 बयाना राशि और जमानत राशि (1) 15.01 SURVEYING (2) 16 रेलवे टेंडर सिस्टम (Railway Tender System) (1) Accidents (2) Active & Passive Earth Pressure (1) Anti corrosive treatment (1) Ballast (2) Bearings in Bridge (1) Blanketing Material (1) Bridges (2) Buckling of track (1) Building Work (1) Cant deficiency & Cant Excess (1) Census (1) Chequered Tiles (1) Chlorination of Water (2) Chlorination Practices (1) Chlorine demand (1) Civil Engineering - Bridges (2) Civil Engineering - P Way (40) Civil Engineering - Works (5) CMS Crossing (1) Completion report (1) Contour & Contour interval (1) Correction Slip (1) CRS Sanction (1) CTR and TGI Value (1) Curing of Concrete (1) curves (2) Deep Screening (2) Design mode (1) Design of concrete mix (2) Destressing (1) Disinfection of water (1) disposal of human waste: (1) Distressed bridges (2) Distressing of LWR (2) distribution System (1) dry density (1) Duties (3) Duties & Responsibilities (9) Duties of Gateman (1) E01.02 Duties of Keyman / Mate / PWS (1) E02.01 Permanent Way (1) E02.02 Handling of 90 UTS rails (1) E02.05 Rail Temperature (1) E02.06 Rail Joints (1) E02.07 Maintenance of Rail Joints (1) E03.01 SLEEPERS AND FASTENINGS - Functions of Sleepers (1) E03.02 Comparison between Various Types of Sleepers (1) E03.04 Laying of Sleepers (1) E04.02 Ballast Profile for L.W.R. track (1) E04.04 Bridges (1) E05.01 Points & Crossings: Introduction & Definitions (1) E05.04 Maintenance and Inspection of Points and Crossing (1) E05.05 Reconditioning of Points and Crossing (1) E06.01 Basics of Curves (1) E06.02 Realignment of Curve (1) E08.01 MAINTENANCE OF TRACK-Through packing (1) E08.02 Systematic Overhauling (1) E08.03 Annual Programme for Regular Track Maintenances (1) E08.04 Lifting/ Lowering of Track and Creep (1) E08.05 Deep Screening (1) E08.06 Short Welded Rail (1) E08.07 Maintenance of SWR (1) E08.10 Level Crossing (1) E08.11 Equipments at Level Crossing (1) E08.12 Maintenance / Examination / Inspection of Level Crossing / Gate (1) E08.14 Welding of Rails (1) E08.15 Records of Material under Trial (As per Cs.no 99) (1) E09.01 Speed Restriction and Indicators (1) E09.02 Safe Working of Contractors (As per Cs.No 95) (1) E09.03 Works Requiring CRS Sanction (1) E10.01 INSPECTION OF TRACK - Object of Inspection (1) E10.02 Riding Quality and Riding Index (1) E10.03 Track Recording and Oscillograph Car (1) E10.04 CTR and TGI Value (1) E12.01 ACCIDENTS AND BREACHES - Accidents (1) E12.02 Breaches (1) E12.03 Diversion (1) E14.01 LONG WELDED RAIL - Definitions (1) E14.02 Permitted locations for LWR/CWR (1) E14.04 Maintenance of LWR / CWR (1) E14.05 DOs and Don’ts OF LWR For PWM / MATES & KEYMAN (1) Egineering (1) Elastic Fastening (1) Elastic Rail Clip (1) Encroachments of Railway land. (2) Engineering (26) Engineering - Book (3) Examination of Rails (2) Fabrication of Glued joint IN SITU. (1) Flushing cisterns (1) FOB (1) Gateman (2) Greasing of ERCs (1) Grow More Food Scheme (1) Guideline (3) H02 भण्डार विभाग का महत्व (1) H03 भण्डार डिपो की संरचना (1) H04 भण्डार का वर्गीकरण (1) H05 कोडिफीकेशन (1) H06 मानकीकरण एवं उसकी उपयोगिता (1) H07 वित्तीय औचित्य के सिध्दांत (1) H08 क्रय के विभिन्न माध्यम (1) H09 क्रय में विविध अधिमान्यताए (1) H10 भण्डार विभाग के अधिकारियो की क्रय शक्तियां (1) H12 निविदा समिति (1) H13 अनुबंध (1) H16 स्थानीय खरीद (1) H17 भण्डार डिपो में भण्डार प्राप्ति के स्त्रोत (1) H18 महत्वपूर्ण वस्तुए एवं उनकी खरीद (1) H19 भण्डार डिपो का संगठन एवं कार्य (1) H20 प्राप्ति अनुभाग की क्रिया - विधि (1) H21 वार्ड की क्रिया - विधि (1) H22 प्रेषण अनुभाग की क्रिया - विधि (1) H23 बहीखाता अनुभाग की क्रिया - विधि (1) H24 डिपो प्रणाली (1) H25 भण्डार का निरीक्षण (1) H26 अस्वीकृत भण्डार (1) H27 लौटाया गया भण्डार (1) H28 अग्रदाय भण्डार (1) H29 अधिशेष भण्डार (1) H30 रेल सामग्री की बिक्री (1) H31 रद्दी माल और नीलामी बिक्रिया (1) H32 वस्तु - सूची नियंत्रण (1) H33 स्टॉक सत्यापन (1) H34 मांगकरताओ व्दारा डिपुओ से भण्डार प्राप्त करने की प्रक्रिया (1) H35 संक्षिप्त टिप्पणीयां (1) Handling of 90 UTS Rails (1) Height Gauges on Electrified Section (1) Honey combing of concrete & its prevention (1) Hot Weather Patrolling (1) Imprest Store (1) INDEX (2) Indicator Boards & Signages (1) Inspection (6) Insulated joints (1) Isolation (1) Keyman / Mate / PWS (3) Laying of Sleepers (1) LDCE Exam (3) Level Crossing (2) Level crossings (2) Licensing Railway Land cultivation (1) Liner Biting (1) LWR (6) Maintenance (2) Maintenance in Electrified Area (2) Maintenance of CMS Xing (1) Maintenance of P Way (5) Maintenance of Rail Joints (1) Maintenancee of SWR (1) Manson precaution (1) Monsoon Patrolling (2) Numerical rating system (NRS) (1) Optimum moisture content (1) P Way (23) Pandrol Clip (1) pass (1) Patrolling of Rail Permanent Way (6) Permanent Way (2) Permanent Way (P Way) (10) Pile Foundation (1) Points and Crossing (3) Protection of Rail (1) Pumping Water Level (1) PWI (1) PWI / AEN / DEN (1) quality control (2) Question & Answer (62) Rail Clusters (1) Rail Formation (2) rail fracture (1) Rail Joints (1) Rail Renewal (3) Rail Welding (3) Rails Defects (2) Railway Affecting Works (1) Railway Construction (1) Railway Organisation (2) Realignments of Curve) (1) Reconditioning of Points and Crossing (1) Rehabilitation of Bridges (1) Renewal of Rail (1) River Training protection work (1) safe speed (1) Safe Working (1) Safety at P. Way Work Site (1) Schedule of Inspection of Bridges (1) Short Note - Bridge (8) Short Note - P Way (48) Short Note - Works (35) Short Notes - Mislanious (7) Sleeper (4) Sleeper Cribs (1) Soil Consistency (1) Special Layouts (2) Speed Restriction and Indicators (2) Static Water Level (1) Steel Structures (1) Stock sheet (1) Store (34) super elevation (1) Tender System (1) Testing of Rails (2) TGI and OMS (1) Thermit Welding (1) Through Parking (2) Tiles (2) Track Circuited Areas (2) Track Inspection (1) Track Machines (6) Track Management System (1) Track Tolerances (2) track-Overhauling (1) Transitions (1) Turnout (1) urinals (1) USFD (2) Venerable location (1) VIDEO (2) wash basin. (1) Washable Aprons (1) Water Cement ratio (1) Water closetsu (1) Water Quality (1) Water Supply (1) Waterproofing (1) weld failure (1) Well Foundation (1) Winter Precautions (1) Workability of Concrete (1) Working of Contractors (2) works (9) कार्य एवं उद्देश्य (1) ट्रैक रिकॉर्डिंग तथा दोलन लेखी कार (1) रेल पथ मेट के कर्तव्य (1)