1. CTEs of Zonal Railways may order limited trials of simple items which don’t infringe with existing provision of standard specification or instructions laid down in manuals/codes. Before undertaking the trial complete scheme of trial should be well chalked out including the parameters to be periodically measured/chalked official to measure/check, periodicity of measurement/checking and Performa in which measurements/observations to be recorded, CRS shall also be kept informed about such trials.
2. The Zonal Railways should periodically inform RDSO about such trials to maximize advantage.
3. Registers:-ADEN shall maintain a register.
4. Particulars of entries
Name of material, Kilometerage where laid, Date of laying, Object of trial, Nature and condition of ballast, Nature and type of formation, Track details, Behavior, Any other relevant information.
