Fabrication of Glued joint IN SITU.
General:-
1. Glued joints are laid at place where insulation of rails as well as continuity of rails is required .
2. Normally Glued joints are fabricated in shop floor and transported to the site however as the glued joints fabricated at the site save effort needed in transportation and also save at least two thermit welds. Welds. Which are a weak link in track. Repairs to a failed/damaged glued joint can also be conveniently done at site, carefully fabricated glued joint in the field can given as good a service as a shop fabricated glued joint.
