Q Bank on Water supply for Civil Engineering LDC Exam - MCQ (New Pattern)

1. Specific yield of well is 
 a) Discharge per unit time 
 b) Yield of well per metre of draw down*
c) Velocity of water per unit time 
d)None of the above
Answer -  b) Yield of well per metre of drawdown*


2.While taking sample of water from well, sample is collected
a)About 2 metre above the bottom of wel
b) About 1 metre above the bottom of well *
c)About 1 metres below the bottom of well
d) none of the above
Answer -b) About 1 metre above the bottom of well *


3. While collecting sample of water from tap the
a) Mouth of tap is heated for 5 minutes* 
b) Mouth of tap is heated for 10 minutes 
 c)Mouth of tap is not heated 
 d)none of the above
Answer -a) Mouth of tap is heated for 5 minutes* 

4. Demand of water for passengers on railway station is 
a)10 litres per passenger 
b)15 litres per passenger
c) 20 litres for passenger
d) 25 litres per passenger*
Answer -d) 25 litres per passenger*

5. Peak hour demand of water is taken as ---------- times the average daily demand 
a)1.5 
b)1.9 
 c)2.25*
 d)2.75 
Answer - c)2.25*

6. The spacing of tube wells should generally be more than ----------from the circle of influence 
a)10 metre 
b)50 metre
c)100 metre* 
d) 500 metre
Answer -c)100 metre* 

7. The capacity of highest storage tank with efficient standby pump should be higher of the following figures 
a)1/4 the maximum water consumption in 24 hours 
 b)1/3 the normal water consumption in 24 hours 
c)1/4 the normal water consumption in 24 hours. 
d) a or b*
 e) b or c
f) a of c
Answer -d) a or b*

8. With regard to standard of quality of drinking water as laid down by Indian Railway , the requirement (desirable) limit of total dissolved solids should not be more than---------- mg/l
a)200
b) 300 
c) 400
d) 500* 
Answer -d) 500* 

9. Chandigarh is a city which has roads generally parallel or perpendicular to each other. The ideal water supply system in such a city should be
a.Dead and system
b.Grid Iron system*
c.Ring system 
d.Any of them
Answer -b.Grid Iron system*

10. Give the most matching option out of list one and list to with regard to pipe appurtenances of fittings

Llist I type of fitting)                                                                  List -II(Function of the fitting)

A) Sluice Valves or gate Valves                          1. We are provided to stop and regulate the flow of                                                                                     water in course of ordinary and emergency operations

B) Scour Valve                                                  2. These are automatic cut off valves. when pressure of                                                                                   water exceeds specific limit the wall operates 
                                                                                 automatically  and saves a particular section of pipe                                                                                    before bursting takes place

C) Air Valve                                                       3. These are located at dead end and the lowest points                                                                                   or depressions in the to remove sand or silt deposited                                                                                  in the water pipe

D) Relief Valve                                                 4. Whenever there are distinct high points in the gradient                                                                          of the pipeline. They are installed to permit 
                                                                                        expulsion of airMatching option A B C D

(a ) 1 2 3 4 
(b) 1 3 4 2* 
(c) 2 4 1 3 
(d) 4 3 2 1
Answer -(b) 1 3 4 2* 


 11. From distribution main of 40 mm size , number of service pipe of 15 mm size can be taken off are---------
a) 3
b) 6
c) 10
d) 12* 
Answer -d) 12* 

12. From the distribution main of 40 mm size, number of service pipe of 20 mm size can be taken off are -------
a)3
B) 6*
c) 10
d) 12 
Answer  - B) 6*

13. From distribution main of 50 mm size, number of service pipes of 15 mm size can be taken off are ------
a) 6
b)10 
c) 12
e):20*
Answer -e):20*

14. PH value of drinking water as per wh0 standards should lie between 
a)5 and 5.5
b)6 and 7
c) 7 and 7.5
d)7 and 8.5*
Answer -d)7 and 8.5*

12. The amount of residual chlorine after a period of contact 10 to 20 minutes is 
 a.0.1 to 0.2 ppm.* 
b.0.2 to 0.3 ppm. 
 c.0.3 to 0.4 ppm
d.0.4 to 0.5ppm
Answer - a.0.1 to 0.2 ppm.* 

13. A rural water supply serves a population of 10, 000 at the rate of 50 litres per capita per day . For the chlorine dose of 2 PPM the required amount of bleaching powder with 20% available chlorine will be
a.0.5 kg 
b.5 kg * 
c.10 kg 
d.15 kg 
Answer -b.5 kg * 

14. The main drawback of centrifugal pump is 
a)necessity of priming
b) discharge from pump varies with the load of water
c) For high heads efficiency is low up to 50%
d) the suction lift is limited to 6 metre
e) all of the above* 
Answer - e) all of the above* 

15.Aeration Of water is done to remove
a) Odour* 
b) Colour 
c) Bacterias 
d) Hardness 
e) Turbidity
Answer - a) Odour* 

16. Requirement of water for platform washing is 
a)5 litre per square metre per day *
b)10 litre per square meter per day
c) 15 litre per square metre per day 
d)20 litre per square metre per day
Answer -a)5 litre per square metre per day *

17. Requirement of water for apron washing 
a.5 litre per square metre per day 
b.10 litre per square metre per day *
c.15 litre per square metre per day
d.20 litre per square metre per day
Answer -b.10 litre per square metre per day *

18. The pumping system should be capable of supplying the normal quantity of water required in 24 hours in 
a)12 hours or less 
b) 16 hours or less
c) 20 hours or less* 
d) 8 hours or less
Answer -c) 20 hours or less* 

19. Water connection given to contractor for construction work can be discontinued by giving a notice of 
a)3 days* 
b) 2 days 
c)7 days
d) no notice is required
Answer -a)3 days* 

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.

Disclaimer: The Information/News/Video provided in this Platform has been collected from different sources. We Believe that “Knowledge Is Power” and our aim is to create general awareness among people and make them powerful through easily accessible Information. NOTE: We do not take any responsibility of authenticity of Information/News/Videos.

Index -

Question & Answer (62) Short Note - P Way (48) Civil Engineering - P Way (43) Short Note - Works (35) Store (34) Engineering (26) P Way (23) Permanent Way (P Way) (13) Duties & Responsibilities (9) Track Machines (9) works (9) Short Note - Bridge (8) Short Notes - Miscellaneous (7) Inspection (6) LWR (6) Patrolling of Rail Permanent Way (6) Civil Engineering - Works (5) Engineering - Book (5) Maintenance of P Way (5) Sleeper (4) Duties (3) Guideline (3) Handbook (3) Keyman / Mate / PWS (3) LDCE Exam (3) Points and Crossing (3) Rail Renewal (3) Rail Welding (3) 15.01 SURVEYING (2) Accidents (2) Ballast (2) Bridges (2) Chlorination of Water (2) Civil Engineering - Bridges (2) Deep Screening (2) Design of concrete mix (2) Distressed bridges (2) Distressing of LWR (2) Encroachments of Railway land. (2) Examination of Rails (2) Gateman (2) INDEX (2) Level Crossing (2) Level crossings (2) Maintenance (2) Maintenance in Electrified Area (2) Monsoon Patrolling (2) Permanent Way (2) Rail Formation (2) Rails Defects (2) Railway Organisation (2) Special Layouts (2) Speed Restriction and Indicators (2) Testing of Rails (2) Through Parking (2) Tiles (2) Track Circuited Areas (2) Track Tolerances (2) USFD (2) VIDEO (2) Working of Contractors (2) curves (2) quality control (2) 01. INTEGRATED CONCEPT AND OBJECTIVES OF MATERIALS MANAGEMENT (1) 01.02 रेलपथ निरक्षक तथा सहायक मंडल अभियंता के कर्तव्य (1) 02 रेलपथ (1) 02. ORGANIZATION OF MATERIALS MANAGEMENT DEPARTMENT (1) 02.01 90 यूटीएस रेलों के सम्भाल (1) 02.04 रेल तापमान (1) 02.05 रेल जोड (1) 03 स्लीपरो के कार्य (1) 03. CLASSIFICATION/CODIFICATION NOMENCLATURE OF STORES ON INDIAN RAILWAYS (1) 03.01 विभिन्न प्रकार के स्लीपरो की तुलना (1) 03.02 लचीले बंधन (1) 03.03 स्लीपर बिछाना (1) 04. PLANNING OF NON-STOCK ITEMS AND PROCESSING OF REQUISITION (1) 04.01 ट्रैक के लिए बैलास्ट प्रोफाइल (1) 04.02 फार्मेशन (1) 04.03 ब्रिज (पुल) (1) 05 पाइंट्स तथा क्रासिंग - परिचय एवं परिभाषाए (1) 05 PLANNING OF STOCK ITEMS & SYSTEMS OF RECOUPMENT (1) 05.01 विषेश ले आउट (1) 05.02 पृथक्रकरण (आइसोलेशन ) (1) 05.03 तथा क्रासिंग का अनुरक्षण तथा निरक्षण (1) 05.04 पॉइंट्स एवं क्रासिंग की (1) 06 गोलाई का प्ररंभिक ज्ञान (1) 06 PURCHASE POLICY (1) 06.01 वर्को का पुनः संरेखण (1) 07 Purchase Procedure on zonal Railways (1) 08 TENDER EVALUATION AND MISCELLANEOUS POLICY ISSUES IN PURCHASES (1) 08.01 व्यव्स्तिथ ओवरहालिंग (1) 08.02 रेलपथ अनुरक्षण का वार्षिक कार्यक्रम (1) 08.04 गहरी छनाई (1) 08.04.1 रेलपथ का उठाना लोवेरिंग तथा क्रीप (1) 08.05 छोटी वेल्डेड रेल ( एसडब्लूआर ) (1) 08.06 आन ट्रैक मशीन (1) 08.07 छोटी ट्रैक मशीने (1) 08.09 विद्युतीकृत सेक्शन में हाइट गेज (1) 08.11 अंडर ट्रायल सामग्री का रिकॉर्ड (1) 09 गति प्रतिबन्ध और संकेतक (1) 09 Receipt And Inspection of stores (1) 09.01 ठेकेदार की सुरक्षित कार्य प्रणाली (1) 09.03 रेल संरक्षा आयुक्त की स्वीकृति वाले कार्य (1) 10 निरक्षण का उद्देश्य (1) 10 ISSUE AND DISTRIBUTION OF STORES (1) 10.01 राइडिंग गुणवत्ता तथा राइडिंग इंडेक्स (1) 10.03 सिटीआर तथा टीजीआई (1) 10.04 रेलपथ प्रबंधन पध्दति (टीऍमएस ) (1) 11 RETURNED STORES (1) 11.01 स्लीपरो का बिछाना (1) 12 दुर्घटना (1) 12 Scrap Disposal (1) 12.01 ब्रीच (1) 12.02 डाईवर्शन (1) 13 INVENTORY MANAGEMENT (1) 14 लंबी वेल्डित रेल (परिभाषाए) (1) 14.01 एलडब्लूआर / सीडब्लूआरके लिये स्वीकृत स्थान (1) 14.02 एलडब्लूआरकी डीस्ट्रेसिंग (1) 14.03 एलडब्लूआर / सीडब्लूआर का अनुरक्षण (1) 14.04 रेलपथ पर्येवेक्षक - मेट तथा चाबीदार के लिए अनुमत तथा निषिद्ध कार्य (1) 15 - सर्वेक्षण (1) 15 बयाना राशि और जमानत राशि (1) 16 रेलवे टेंडर सिस्टम (Railway Tender System) (1) Active & Passive Earth Pressure (1) Anti corrosive treatment (1) Bearings in Bridge (1) Blanketing Material (1) Buckling of track (1) Building Work (1) CMS Crossing (1) CRS Sanction (1) CTR and TGI Value (1) Cant deficiency & Cant Excess (1) Census (1) Chequered Tiles (1) Chlorination Practices (1) Chlorine demand (1) Completion report (1) Contour & Contour interval (1) Correction Slip (1) Curing of Concrete (1) Design mode (1) Destressing (1) Disinfection of water (1) Duties of Gateman (1) E01.02 Duties of Keyman / Mate / PWS (1) E02.01 Permanent Way (1) E02.02 Handling of 90 UTS rails (1) E02.05 Rail Temperature (1) E02.06 Rail Joints (1) E02.07 Maintenance of Rail Joints (1) E03.01 SLEEPERS AND FASTENINGS - Functions of Sleepers (1) E03.02 Comparison between Various Types of Sleepers (1) E03.04 Laying of Sleepers (1) E04.02 Ballast Profile for L.W.R. track (1) E04.04 Bridges (1) E05.01 Points & Crossings: Introduction & Definitions (1) E05.04 Maintenance and Inspection of Points and Crossing (1) E05.05 Reconditioning of Points and Crossing (1) E06.01 Basics of Curves (1) E06.02 Realignment of Curve (1) E08.01 MAINTENANCE OF TRACK-Through packing (1) E08.02 Systematic Overhauling (1) E08.03 Annual Programme for Regular Track Maintenances (1) E08.04 Lifting/ Lowering of Track and Creep (1) E08.05 Deep Screening (1) E08.06 Short Welded Rail (1) E08.07 Maintenance of SWR (1) E08.10 Level Crossing (1) E08.11 Equipments at Level Crossing (1) E08.12 Maintenance / Examination / Inspection of Level Crossing / Gate (1) E08.14 Welding of Rails (1) E08.15 Records of Material under Trial (As per Cs.no 99) (1) E09.01 Speed Restriction and Indicators (1) E09.02 Safe Working of Contractors (As per Cs.No 95) (1) E09.03 Works Requiring CRS Sanction (1) E10.01 INSPECTION OF TRACK - Object of Inspection (1) E10.02 Riding Quality and Riding Index (1) E10.03 Track Recording and Oscillograph Car (1) E10.04 CTR and TGI Value (1) E12.01 ACCIDENTS AND BREACHES - Accidents (1) E12.02 Breaches (1) E12.03 Diversion (1) E14.01 LONG WELDED RAIL - Definitions (1) E14.02 Permitted locations for LWR/CWR (1) E14.04 Maintenance of LWR / CWR (1) E14.05 DOs and Don’ts OF LWR For PWM / MATES & KEYMAN (1) Egineering (1) Elastic Fastening (1) Elastic Rail Clip (1) FOB (1) Fabrication of Glued joint IN SITU. (1) Flushing cisterns (1) Greasing of ERCs (1) Grow More Food Scheme (1) H02 भण्डार विभाग का महत्व (1) H03 भण्डार डिपो की संरचना (1) H04 भण्डार का वर्गीकरण (1) H05 कोडिफीकेशन (1) H06 मानकीकरण एवं उसकी उपयोगिता (1) H07 वित्तीय औचित्य के सिध्दांत (1) H08 क्रय के विभिन्न माध्यम (1) H09 क्रय में विविध अधिमान्यताए (1) H10 भण्डार विभाग के अधिकारियो की क्रय शक्तियां (1) H12 निविदा समिति (1) H13 अनुबंध (1) H16 स्थानीय खरीद (1) H17 भण्डार डिपो में भण्डार प्राप्ति के स्त्रोत (1) H18 महत्वपूर्ण वस्तुए एवं उनकी खरीद (1) H19 भण्डार डिपो का संगठन एवं कार्य (1) H20 प्राप्ति अनुभाग की क्रिया - विधि (1) H21 वार्ड की क्रिया - विधि (1) H22 प्रेषण अनुभाग की क्रिया - विधि (1) H23 बहीखाता अनुभाग की क्रिया - विधि (1) H24 डिपो प्रणाली (1) H25 भण्डार का निरीक्षण (1) H26 अस्वीकृत भण्डार (1) H27 लौटाया गया भण्डार (1) H28 अग्रदाय भण्डार (1) H29 अधिशेष भण्डार (1) H30 रेल सामग्री की बिक्री (1) H31 रद्दी माल और नीलामी बिक्रिया (1) H32 वस्तु - सूची नियंत्रण (1) H33 स्टॉक सत्यापन (1) H34 मांगकरताओ व्दारा डिपुओ से भण्डार प्राप्त करने की प्रक्रिया (1) H35 संक्षिप्त टिप्पणीयां (1) Handling of 90 UTS Rails (1) Height Gauges on Electrified Section (1) Honey combing of concrete & its prevention (1) Hot Weather Patrolling (1) Imprest Store (1) Indicator Boards & Signages (1) Insulated joints (1) Isolation (1) Laying of Sleepers (1) Licensing Railway Land cultivation (1) Liner Biting (1) Maintenance of CMS Xing (1) Maintenance of Rail Joints (1) Maintenancee of SWR (1) Manson precaution (1) Numerical rating system (NRS) (1) Optimum moisture content (1) PWI (1) PWI / AEN / DEN (1) Pandrol Clip (1) Pile Foundation (1) Protection of Rail (1) Pumping Water Level (1) Rail Clusters (1) Rail Joints (1) Railway Affecting Works (1) Railway Construction (1) Realignments of Curve) (1) Reconditioning of Points and Crossing (1) Rehabilitation of Bridges (1) Renewal of Rail (1) River Training protection work (1) Safe Working (1) Safety at P. Way Work Site (1) Schedule of Inspection of Bridges (1) Sleeper Cribs (1) Soil Consistency (1) Static Water Level (1) Steel Structures (1) Stock sheet (1) TGI and OMS (1) Tender System (1) Thermit Welding (1) Track Inspection (1) Track Maintenance (1) Track Management System (1) Transitions (1) Turnout (1) Venerable location (1) Washable Aprons (1) Water Cement ratio (1) Water Quality (1) Water Supply (1) Water closetsu (1) Waterproofing (1) Well Foundation (1) Winter Precautions (1) Workability of Concrete (1) disposal of human waste: (1) distribution System (1) dry density (1) pass (1) rail fracture (1) safe speed (1) super elevation (1) track-Overhauling (1) urinals (1) wash basin. (1) weld failure (1) कार्य एवं उद्देश्य (1) ट्रैक रिकॉर्डिंग तथा दोलन लेखी कार (1) रेल पथ मेट के कर्तव्य (1)