1.Phosphor Bronze bearing need not be greased. True
2.Primer coat protects the steel from weather.False
3.Clear span is more than the effective span False
4.Danger level is always above HFL.False
5.Acetelyne gas cylinders are always kept vertical True
6.A speed restriction of 15 kmph can be imposed in a Neutral section. False
8.Camber is measured at the ends of a girder.False
9.Temporary girders are used for normal sectional speed.False
10.4 SWG electrode is thicker than 6 SWG electrodes.True
11.Red lead paint is not poisonous. False
12.Wire rope pulleys are interchangeable with manilla rope pulleys.False
13.Portal bracing of a through girder is deeper than sway bracing.True
14.Numerical ledger shows the name of staff in numerical order. False
15.Hemispherical Tanks having inner ties.False
16.Water tanks are to be painted inside once in 5 years. False
17.In case of Tremie concreting for 20 mm size of aggregate the tremie pipe should not be less than 200 mm. True
18.The dry film thickness of paint shall be measured by anemometer.False
19.The ord. MS Rivet testing hammer can be used for testing metalised girders.False
20.The distance between center to center of bearing is effective span of a girder bridge. True
21.Guard rail should be provided on all major and minor girder bridges. True
22.A bridge foundation having less then 1.2M depth below bed level is termed as shallow foundation. True
23.When cracks are active but cause of cracking has been determined and remedial action has been taken cement pressure grouting is used. True
24.Shelf life of Paint Red Oxide Ready mixed (IS : 123) is 4 month. False
25.IRBM consists of 14 chapters. True