Q No. 11: Write short notes on any five of the following:
(a) Quality Control measures at the Renewal sites of contractors
(b) Imprest Store
(c) Classification of defects, Marking & action taken in USFD
(d) Maintenance precaution in LWR Track
(e) Permitted location of LWR
(f) Stock Sheet
(g) Main duties of ADEN
(a) Quality Control measures at the Renewal sites of contractors:- It is very important to ensure the quality of work at renewal sites as the contractor labour are not careful about to maintains the track parameters within the safe permissible limits. Hence to ensure the track parameters within safe and permissible limits the following measures have been taken.
i. Only qualified and experienced supervisors should be deputed to execute the work.
ii. Contractors supervisors should be qualified and experienced, his knowledge must be examine by the officers not below the post of ADEN and a competency certificate should be issued in this regard.
iii. Work should not be started without the presence of both the supervisors.
iv. Sufficient and skilled labour should be available before a start of the work. v. Proper site order book should be maintained at site and regular inspection and monitoring of track parameters must be ensured.
vi. A separate register named the quality control register should be maintained at site.
vii. At the end of the day’s work all the relevant track parameters are measured not down in the quality control register carefully. A safety certificate will be given by the railway supervisor that “The track parameters of the work done today are noted carefully and found safe for the passage of train at the imposed speed at the work site.
viii. Any unusual/unsafe track parameters must be attended before leaving the site. ix. All the instruction issued by the officers must be followed strictly.
(b) Imprest Store: - The store which is not meant for any specific work but are held in advance to meat out the emergences such as accident/derailment or to carry out the emergent renewal. These stores when used during accidents are debited to revenue and when used directed for emergent renewal are debited to DRF. Following attentions are required for imprest store.
i. Scale of imprest store is fixed by CTE.
ii. These Stores should be stacked separately
iii. These stores should not be transferred to other stock holders.
iv. These stores should not be used for routine maintenance
(C) Classification of Defects, Marking and Action taken in USF D:- During USFD testing of rail following to be done.
(d) Maintenance precaution in LWR track: - Maintenance of LWR is very sensitive and required special attention some of precaution required are as under:-
i. Any maintenance of LWR/CWR should be under competent and trained personnel
ii. Maintenance work should be confined to hours when the rail temperature is between Td + 10 and Td-30. If rail temperature after maintenance operations exceeds Td+20 Centigrade than during the consolidation period speed restriction of 50 Kmph shall be imposed.
iii. Ballast section should be properly maintained, lifting of track should be avoided during the alignment correction by crow bars.
iv. All fitting and fasting should be effective, complete and secure.
v. Not more than one sleeper in 30 consecutive sleepers shall be replaced at a time.
vi. Change of fastening not requiring lifting of rails shall be done one sleeper at a time and at least 15 sleepers in between shall be kept intact and work should be done under super vision of keyman.
vii. Change of fastening requiring lifting of rail should be done of one sleeper and atleast 30 sleepers shall be kept intact and work should be done under super vision of gang mate.
(e). Permitted Location for LWR:-
i. Complete track renewal shall provide with LWR/CWR. Existing rail laid on permitted location may also be converted into LWR/CWR.
ii. New construction/doubling/Gauge conversion shall be opened with LWR/CWR
iii. In goods running lines where condition of all the track component is sound
iv. LWR/CWR shall not be permitted where rails are subjected heavy wear,
corrosion and needing frequent renewal
v. LWR/CWR shall not be permitted where formation is weak or formation soil is susceptible to competing.
vi. LWR/CWR shall not be permitted on curve sharper thann440 mtr radius.
vii. LWR/CWR shall not be permitted on reverse curves sharper than 875 mtr radius.
viii. The steepest permitted grade shall be 1 in 100
ix. Minimum radius for LWR/CWR for vertical Curve shall be 4000 mtr for A route, 3000 Mtr for B route and 2500 mtr for C,D & E route
(f) Stock sheet.:- Departmental verification of stores under subordinates is done by stock verifiers of the account department at a specified frequency. Who often physically verified the store entries in their field book.The report of verification is furnished by the stock verifiers in a standard form called stock verification sheet or stock sheet. During verification, stock sheet for irregularities if any is prepared in four copies. Original copy is sent to account officer explanation of the stock holder is recorded on second & third copy and submitted to Divisional Engineer whom retains third copy and forward second copy to account officer for further action. Forth copy is kept as office copy by stock holder.
(g) Main duties of ADEN:- ADEN is generally responsible for the maintenance and safety of all way and works in his charge for the accuracy, quality and progress of new work and control over all expenditure in relation to budget allotment. Main duties of ADEN are as under:-
i. Inspection and maintenance of track and all structures in a satisfactory and safe conditions.
ii. Preparation of plans and estimates, execution and measurement of works including track works.
iii. Verifications of stores held by stock holders. iv. Submission of proposal for inclusion in the track renewal program, revenue budget and the work program.
In addition of above others duties are as under:-
i. He should remain update for rules and regulation issue time to time and he shall ensured that all the staff under him are acquainted with relevant rules and regulations connected with their duties.
ii. He should cooperate effectively with officers and staff other department. In matters that warrant coordination.
iii. He has to accompany inspection by higher officials with all records.
iv. He shall conduct inspection in his jurisdiction as per the schedules laid down by the administration from time to time.
v. Inspection of permanent way – he shell inspect the permanent way under his jurisdiction by push trolley/motor trolley, by foot plate/break van inspection by the fastest train of the section, he shell inspect of all L- Xing’s, Curves, Points & Xing, Bridges patrolling etc. as per laid down schedule.
vi. He shall examine the traffic renewal works, measurement of ballast.
vii. Action in case of emergencies. In case of an accident, bridge or any accident which effaced the running of train he should take all possible and prompt action to restore the traffic as soon as possible.
viii. He should accompany the TRC run in his jurisdiction and take down notes regarding the spots needing attention