Quality Control measures at the Renewal sites of contractors
Quality Control measures at the Renewal sites of contractors:- It is very important to ensure the quality of work at renewal sites as the contractor labour are not careful about to maintains the track parameters within the safe permissible limits. Hence to ensure the track parameters within safe and permissible limits the following measures have been taken.
i. Only qualified and experienced supervisors should be deputed to execute the work.
ii. Contractors supervisors should be qualified and experienced, his knowledge must be examine by the officers not below the post of ADEN and a competency certificate should be issued in this regard.
iii. Work should not be started without the presence of both the supervisors.
iv. Sufficient and skilled labour should be available before a start of the work. v. Proper site order book should be maintained at site and regular inspection and monitoring of track parameters must be ensured.
vi. A separate register named the quality control register should be maintained at site.
vii. At the end of the day’s work all the relevant track parameters are measured not down in the quality control register carefully. A safety certificate will be given by the railway supervisor that “The track parameters of the work done today are noted carefully and found safe for the passage of train at the imposed speed at the work site.
viii. Any unusual/unsafe track parameters must be attended before leaving the site. ix. All the instruction issued by the officers must be followed strictly.