SEARCH YOUR QUERY

Wednesday, March 27, 2024

Store - CLASSIFICATION, CODIFICATION AND NOMENCLATURE OF STORES ON INDIAN RAILWAYS

3.1.0 General Classification of Stores:

Stores Department on Indian Railways is required to give a service to various departments by making thousands of items available to their indenters as and when required. To give this service we have to maintain stocks of a large number of items called as "Stock items" whereas for other items which are not frequently required or are of one time requirement, no stocks are maintained. These items are purchased as and when required to meet specific demands and are called as `Non-stock items'. The stock items are further classified as under:
3.1.1 Ordinary Stores : These are generally such items of stores for which there is a regularturnover caused by a constant demand. These may be further subdivided as 
  • New, 
  • Second hand
  • Serviceable and
  • Second hand repairable.
3.1.2 Emergency Stores : The Stores depots are also required to stock certain items of stores even though they do not have a regular turnover. These are emergency stores and comprise of items which do not ordinarily wear out or require renewal but which are required to be kept in stock to meet emergency due to breakage or unanticipated deterioration.
  • These items are not readily available in the market and as such would require a long time for procurement in case they are not stocked. These are generally components of imported machines and Rolling Stock.
3.1.3 Surplus Stores : These are the items of ordinary stock which are not demanded by the users. If any item is not issued for past 24 months or more, it is declared as surplus. Surplus stores are further classified as dead surplus and movable surplus.

a. Dead Surplus Stores : These are the items which have not been issued to any indentor during past 24 months or more and are not likely to be utilized on any Railway within next 2 years

b. Movable Surplus Stores: These are the items which have not been issued to any indentor during past 24 months but their use in near future (within 24 months) is anticipated.

3.1.4 Special Stores : The items of stores arranged and stocked for works and other special purposes i.e. other than for operation or ordinary maintenance and repairs are called "Special Stores". These are kept separate from ordinary stores and issued to the work for which they have been arranged.

3.2.0 Other Classification Of Stores :

Apart from above some other classifications as under are also prevalent on Indian Railways.

3.2.1 Custody Stores : These are stores which have been purchased for special works and charged to such works but due to inadequate stocking facilities available with user/indentor have been kept in the custody of stores department. These are generally non- stock items but in certain situations stock items also may be under this classification.

3.2.2 Imprest Stores : Certain important units like loco sheds, train examining depots etc require a large number of items for day to day repairs, maintenance and operation of rolling stock. Such items include consumable stores like cotton wastes, oils, greases etc. as well as the spares required for rolling stock.
  • The senior supervisor in-charge of the unit like running sheds, Train Examining Depots, Chief Signal Inspector, Electric Foreman etc. are allowed to maintain stocks of nominated items of stores. The limits up to which the stocks are to be kept are also specified while sanctioning such items and are generally fixed as equivalent to two or three months' requirement.
  • Imprest stores are standing advance of materials to meet the day to day requirement of repairs maintenance and operation of rolling stock etc. On most Railways the Imprest stores are charged off to the final head of Account under revenue working expenses. However, detailed A/c are maintained by these units and monthly Imprest recoupment schedules are sent by the Imprest holders to the nominated stores depots for bringing their stocks to the Imprest level sanctioned.
3.2.3 Standard And Non-Standard Items : Most of the items used on Indian Railways have been standardized i.e. their description, dimensions and specifications have been made standard and also a standard code no. has been allotted for easy identification. However, still there may be few items which have not been standardized and therefore obviously no code no. has been allotted for them. Such items are known as Non- Standard items.
  • A non-standard item will necessarily be a non-stock item but all standard items are not stock items i.e. an item which has been allotted a code no. may still be a non- stock item.

3.3.0 Codification Of Stores :

In order to recognize every item distinctly, all standard items being used on Railways, have been allotted a code number, which is also known as Price List (PL) No. These Nos. enable unique identification of items and as a result of extensive standardization all over the Railways, enable easy exchange of information among nine Railway Zones and six Production Units. While allotting these numbers, an opportunity has been taken to group the items in a meaningful manner so that group-wise analysis of materials is also facilitated.

We can have three types of codification systems ; 
  • Fully significant, 
  • Semi-significant and
  • Non-significant.
  • In fully significant system, all the digits of the code signify some property of the material while in a non-significant system, digits have no significance and one can not guess anything about material by seeing only code no. Obviously if we have large number of items developing fully significant system will require a large no. of digits which may not be manageable.
  • Therefore in Railways we have designed a 8 digit semi-significant coding system in which first 4 digits signify some property of the material while other 4 digits are non- significant. This code No. is known as Price List No. or PL NO.
3.3.1 All the Railway materials have been classified in 76 `Major Groups' or 'Main Groups' or groups. Each Major/main group (or groups) has been further classified into several sub- groups. Great car has been taken to ensure that groups and sub-groups do not overlap and the numbers have been allotted in a meaningful order and also they are unique.

3.3.2 Each PL No. is sub-divided into 4 parts as under ;

90 35 058 3

Part A -- First Two Digits

Part B -- Third and fourth digit

Part C-- Fifth , Sixth and seventh digit

Part D-- Last digit

Part `A' consists of two digits representing the main group of stores to which the item belongs. in the present example main group is `90' which is for steel items.

Part `B' consists of two digits representing sub-group. Each group has been further divided into sub-groups. Here `35' is the sub-group which is for various sizes of Mild Steel Flats.
  • The sub-grouping for the most of rolling stock groups is on the basis of  major assemblies of which the item is a part
Part `C' consists of 3 digits and is the serial number of the item within the sub group. No significance is attached to this number. In the above example serial number is 58.

Part `D' consists of one digit which has a special significance with reference to computerization. This is the check digit. This digit is unique to a given number and is intended to check the integrity of the code number.

3.3.3 Method of verifying P.L. NO :

Wherever the computer encounters a code No. during processing, it calculates the check digit on the basis of modulas 11 and checks if the calculated digit tallies with the check digit shown on the document and punched. If the two do not tally, the voucher is rejected. 

Method :Calculation method is given below. 

 CHECK DIGIT : DATA VALIDATION WHILE PROCESSING;

( BASED ON MODULAS 11)

1. WRITE 2 TO 8 BELOW EACH DIGIT OF CODE FROM RIGHT TO LEFT EXCEPT  CHECK DIGIT,

2. MULTIPLY THE DIGITS VERTICALLY &

3. ADD PRODUCTS OF MULTIPLICATION HORIZONTALLY,

4. DIVIDE THE SUM OF PRODUCTS BY 11,

5. THE REMAINDER OF DIVISION IS CHECK DIGIT

(RIGHT MOST DIGIT IF YOU GET 2-Digit REMAINDER)

Sample Check digit calculation :

2 5 1 6 1 0 4 ?

X X X X X X X

8 7 6 5 4 3 2 - 16 + 35 + 6 + 30 + 4 + 0 + 8 = 99

99/11 = 11*9 + 0 , i.e. Remainder = 0

Therefore, Check digit = 0


 MAIN GROUPS CODES



3.3.4 Unification of P.L. NO: A Price List number may be either unified or non- unified. If a Price List number for an item is unified, all the Railways and Production unit uses same number as PL code for this item. This facilitates easy exchange of information between the Railways. Disposal of surplus stores and centralized purchase become easier. In case of non- unified Price List numbers, all the Railways do not use same code for the same item. Our attempt is always to have unified Price List numbers.

3.4.0 Nomenclature Lists :

3.4.1 It is not easy for the indentors to remember codes for all the items which are likely to be required by them. As a stock item can not be indented without quoting Price List number in the requisition, Major group wise Nomenclature lists (popularly known as PL books) have been printed for all the items classified in a Major group.

This list contains 
  • Code number, 
  • Description, 
  • Specification, 
  • Unit of accountal and
  • Details of Railways and depots where the item is stocked.
These books have been distributed to all the departments and indentors. The nomenclature list (PL book) of which all the items are unified, is known as unified nomenclature list.

3.4.1.1 Description Of Stores : The basic commodity method has been adopted in describing an item. In this system the mention of the basic commodity precedes the detailed description of the item.
  • For example "ordinary toilet soap" would, under the method, be described as "Soap, Toilet, ordinary" because the basic commodity is soap. The word "toilet" specifies the kind of that commodity and "ordinary" further qualifies the toilet variety.
  • If the basic commodity method is not used, the different kinds of soaps will find themselves listed in different places. In short the description should be arranged in the following order of precedence :
1. The mention of the basic commodity

2. The general variance in kind, use size or shape

3. The particular kind or size.

4. The specification / drawing.

A few instances of how the items would have been described in P.L. books are :



3.4.2 End Use Of Item : Against some items, the purpose for which the items are used, is incorporated in the nomenclature list. For instance there are numerous grades of lubricating oils stocked and used for various purposes. This information is briefly mentioned in the nomenclature list as a part of the description , say in remarks column, as this will greatly help the consumer.

3.4.3 Mention Of Makers' Name : The commercial brand or the proprietary make of the item will be avoided in the description unless the item is of proprietary nature. The description of the basic commodity only will find a place in nomenclature list.

3.4.4 Specification Or Drawing : Reference to a standard specification or in its absence the Railway's drawing, if any, will be mentioned against each description. Such specification and drawing references are not only useful to suppliers, including Railway manufacturing shops but also assist the stores Department in the purchase as well as inspection of supplies.

3.4.5 The Unit : It is desirable that for a particular item, all references should confirm to one and the same unit, as this will avoid unnecessary references and would also facilitate issues and receipts eliminating arithmetical errors in conversion from one unit to another. The unit code has been indicated in a separate column of the PL Book. Unit Code consists of 2 digits.

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.

Disclaimer: The Information/News/Video provided in this Platform has been collected from different sources. We Believe that “Knowledge Is Power” and our aim is to create general awareness among people and make them powerful through easily accessible Information. NOTE: We do not take any responsibility of authenticity of Information/News/Videos.

Index -

01. INTEGRATED CONCEPT AND OBJECTIVES OF MATERIALS MANAGEMENT (1) 01.02 रेलपथ निरक्षक तथा सहायक मंडल अभियंता के कर्तव्य (1) 02 रेलपथ (1) 02. ORGANIZATION OF MATERIALS MANAGEMENT DEPARTMENT (1) 02.01 90 यूटीएस रेलों के सम्भाल (1) 02.04 रेल तापमान (1) 02.05 रेल जोड (1) 03 स्लीपरो के कार्य (1) 03. CLASSIFICATION/CODIFICATION NOMENCLATURE OF STORES ON INDIAN RAILWAYS (1) 03.01 विभिन्न प्रकार के स्लीपरो की तुलना (1) 03.02 लचीले बंधन (1) 03.03 स्लीपर बिछाना (1) 04. PLANNING OF NON-STOCK ITEMS AND PROCESSING OF REQUISITION (1) 04.01 ट्रैक के लिए बैलास्ट प्रोफाइल (1) 04.02 फार्मेशन (1) 04.03 ब्रिज (पुल) (1) 05 पाइंट्स तथा क्रासिंग - परिचय एवं परिभाषाए (1) 05 PLANNING OF STOCK ITEMS & SYSTEMS OF RECOUPMENT (1) 05.01 विषेश ले आउट (1) 05.02 पृथक्रकरण (आइसोलेशन ) (1) 05.03 तथा क्रासिंग का अनुरक्षण तथा निरक्षण (1) 05.04 पॉइंट्स एवं क्रासिंग की (1) 06 गोलाई का प्ररंभिक ज्ञान (1) 06 PURCHASE POLICY (1) 06.01 वर्को का पुनः संरेखण (1) 07 Purchase Procedure on zonal Railways (1) 08 TENDER EVALUATION AND MISCELLANEOUS POLICY ISSUES IN PURCHASES (1) 08.01 व्यव्स्तिथ ओवरहालिंग (1) 08.02 रेलपथ अनुरक्षण का वार्षिक कार्यक्रम (1) 08.04 गहरी छनाई (1) 08.04.1 रेलपथ का उठाना लोवेरिंग तथा क्रीप (1) 08.05 छोटी वेल्डेड रेल ( एसडब्लूआर ) (1) 08.06 आन ट्रैक मशीन (1) 08.07 छोटी ट्रैक मशीने (1) 08.09 विद्युतीकृत सेक्शन में हाइट गेज (1) 08.11 अंडर ट्रायल सामग्री का रिकॉर्ड (1) 09 गति प्रतिबन्ध और संकेतक (1) 09 Receipt And Inspection of stores (1) 09.01 ठेकेदार की सुरक्षित कार्य प्रणाली (1) 09.03 रेल संरक्षा आयुक्त की स्वीकृति वाले कार्य (1) 10 निरक्षण का उद्देश्य (1) 10 ISSUE AND DISTRIBUTION OF STORES (1) 10.01 राइडिंग गुणवत्ता तथा राइडिंग इंडेक्स (1) 10.03 सिटीआर तथा टीजीआई (1) 10.04 रेलपथ प्रबंधन पध्दति (टीऍमएस ) (1) 11 RETURNED STORES (1) 11.01 स्लीपरो का बिछाना (1) 12 दुर्घटना (1) 12 Scrap Disposal (1) 12.01 ब्रीच (1) 12.02 डाईवर्शन (1) 13 INVENTORY MANAGEMENT (1) 14 लंबी वेल्डित रेल (परिभाषाए) (1) 14.01 एलडब्लूआर / सीडब्लूआरके लिये स्वीकृत स्थान (1) 14.02 एलडब्लूआरकी डीस्ट्रेसिंग (1) 14.03 एलडब्लूआर / सीडब्लूआर का अनुरक्षण (1) 14.04 रेलपथ पर्येवेक्षक - मेट तथा चाबीदार के लिए अनुमत तथा निषिद्ध कार्य (1) 15 - सर्वेक्षण (1) 15 बयाना राशि और जमानत राशि (1) 15.01 SURVEYING (2) 16 रेलवे टेंडर सिस्टम (Railway Tender System) (1) Accidents (2) Active & Passive Earth Pressure (1) Anti corrosive treatment (1) Ballast (2) Bearings in Bridge (1) Blanketing Material (1) Bridges (2) Buckling of track (1) Building Work (1) Cant deficiency & Cant Excess (1) Census (1) Chequered Tiles (1) Chlorination of Water (2) Chlorination Practices (1) Chlorine demand (1) Civil Engineering - Bridges (2) Civil Engineering - P Way (41) Civil Engineering - Works (5) CMS Crossing (1) Completion report (1) Contour & Contour interval (1) Correction Slip (1) CRS Sanction (1) CTR and TGI Value (1) Curing of Concrete (1) curves (2) Deep Screening (2) Design mode (1) Design of concrete mix (2) Destressing (1) Disinfection of water (1) disposal of human waste: (1) Distressed bridges (2) Distressing of LWR (2) distribution System (1) dry density (1) Duties (3) Duties & Responsibilities (9) Duties of Gateman (1) E01.02 Duties of Keyman / Mate / PWS (1) E02.01 Permanent Way (1) E02.02 Handling of 90 UTS rails (1) E02.05 Rail Temperature (1) E02.06 Rail Joints (1) E02.07 Maintenance of Rail Joints (1) E03.01 SLEEPERS AND FASTENINGS - Functions of Sleepers (1) E03.02 Comparison between Various Types of Sleepers (1) E03.04 Laying of Sleepers (1) E04.02 Ballast Profile for L.W.R. track (1) E04.04 Bridges (1) E05.01 Points & Crossings: Introduction & Definitions (1) E05.04 Maintenance and Inspection of Points and Crossing (1) E05.05 Reconditioning of Points and Crossing (1) E06.01 Basics of Curves (1) E06.02 Realignment of Curve (1) E08.01 MAINTENANCE OF TRACK-Through packing (1) E08.02 Systematic Overhauling (1) E08.03 Annual Programme for Regular Track Maintenances (1) E08.04 Lifting/ Lowering of Track and Creep (1) E08.05 Deep Screening (1) E08.06 Short Welded Rail (1) E08.07 Maintenance of SWR (1) E08.10 Level Crossing (1) E08.11 Equipments at Level Crossing (1) E08.12 Maintenance / Examination / Inspection of Level Crossing / Gate (1) E08.14 Welding of Rails (1) E08.15 Records of Material under Trial (As per Cs.no 99) (1) E09.01 Speed Restriction and Indicators (1) E09.02 Safe Working of Contractors (As per Cs.No 95) (1) E09.03 Works Requiring CRS Sanction (1) E10.01 INSPECTION OF TRACK - Object of Inspection (1) E10.02 Riding Quality and Riding Index (1) E10.03 Track Recording and Oscillograph Car (1) E10.04 CTR and TGI Value (1) E12.01 ACCIDENTS AND BREACHES - Accidents (1) E12.02 Breaches (1) E12.03 Diversion (1) E14.01 LONG WELDED RAIL - Definitions (1) E14.02 Permitted locations for LWR/CWR (1) E14.04 Maintenance of LWR / CWR (1) E14.05 DOs and Don’ts OF LWR For PWM / MATES & KEYMAN (1) Egineering (1) Elastic Fastening (1) Elastic Rail Clip (1) Encroachments of Railway land. (2) Engineering (26) Engineering - Book (3) Examination of Rails (2) Fabrication of Glued joint IN SITU. (1) Flushing cisterns (1) FOB (1) Gateman (2) Greasing of ERCs (1) Grow More Food Scheme (1) Guideline (3) H02 भण्डार विभाग का महत्व (1) H03 भण्डार डिपो की संरचना (1) H04 भण्डार का वर्गीकरण (1) H05 कोडिफीकेशन (1) H06 मानकीकरण एवं उसकी उपयोगिता (1) H07 वित्तीय औचित्य के सिध्दांत (1) H08 क्रय के विभिन्न माध्यम (1) H09 क्रय में विविध अधिमान्यताए (1) H10 भण्डार विभाग के अधिकारियो की क्रय शक्तियां (1) H12 निविदा समिति (1) H13 अनुबंध (1) H16 स्थानीय खरीद (1) H17 भण्डार डिपो में भण्डार प्राप्ति के स्त्रोत (1) H18 महत्वपूर्ण वस्तुए एवं उनकी खरीद (1) H19 भण्डार डिपो का संगठन एवं कार्य (1) H20 प्राप्ति अनुभाग की क्रिया - विधि (1) H21 वार्ड की क्रिया - विधि (1) H22 प्रेषण अनुभाग की क्रिया - विधि (1) H23 बहीखाता अनुभाग की क्रिया - विधि (1) H24 डिपो प्रणाली (1) H25 भण्डार का निरीक्षण (1) H26 अस्वीकृत भण्डार (1) H27 लौटाया गया भण्डार (1) H28 अग्रदाय भण्डार (1) H29 अधिशेष भण्डार (1) H30 रेल सामग्री की बिक्री (1) H31 रद्दी माल और नीलामी बिक्रिया (1) H32 वस्तु - सूची नियंत्रण (1) H33 स्टॉक सत्यापन (1) H34 मांगकरताओ व्दारा डिपुओ से भण्डार प्राप्त करने की प्रक्रिया (1) H35 संक्षिप्त टिप्पणीयां (1) Handling of 90 UTS Rails (1) Height Gauges on Electrified Section (1) Honey combing of concrete & its prevention (1) Hot Weather Patrolling (1) Imprest Store (1) INDEX (2) Indicator Boards & Signages (1) Inspection (6) Insulated joints (1) Isolation (1) Keyman / Mate / PWS (3) Laying of Sleepers (1) LDCE Exam (3) Level Crossing (2) Level crossings (2) Licensing Railway Land cultivation (1) Liner Biting (1) LWR (6) Maintenance (2) Maintenance in Electrified Area (2) Maintenance of CMS Xing (1) Maintenance of P Way (5) Maintenance of Rail Joints (1) Maintenancee of SWR (1) Manson precaution (1) Monsoon Patrolling (2) Numerical rating system (NRS) (1) Optimum moisture content (1) P Way (23) Pandrol Clip (1) pass (1) Patrolling of Rail Permanent Way (6) Permanent Way (2) Permanent Way (P Way) (10) Pile Foundation (1) Points and Crossing (3) Protection of Rail (1) Pumping Water Level (1) PWI (1) PWI / AEN / DEN (1) quality control (2) Question & Answer (62) Rail Clusters (1) Rail Formation (2) rail fracture (1) Rail Joints (1) Rail Renewal (3) Rail Welding (3) Rails Defects (2) Railway Affecting Works (1) Railway Construction (1) Railway Organisation (2) Realignments of Curve) (1) Reconditioning of Points and Crossing (1) Rehabilitation of Bridges (1) Renewal of Rail (1) River Training protection work (1) safe speed (1) Safe Working (1) Safety at P. Way Work Site (1) Schedule of Inspection of Bridges (1) Short Note - Bridge (8) Short Note - P Way (48) Short Note - Works (35) Short Notes - Mislanious (7) Sleeper (4) Sleeper Cribs (1) Soil Consistency (1) Special Layouts (2) Speed Restriction and Indicators (2) Static Water Level (1) Steel Structures (1) Stock sheet (1) Store (34) super elevation (1) Tender System (1) Testing of Rails (2) TGI and OMS (1) Thermit Welding (1) Through Parking (2) Tiles (2) Track Circuited Areas (2) Track Inspection (1) Track Machines (6) Track Management System (1) Track Tolerances (2) track-Overhauling (1) Transitions (1) Turnout (1) urinals (1) USFD (2) Venerable location (1) VIDEO (2) wash basin. (1) Washable Aprons (1) Water Cement ratio (1) Water closetsu (1) Water Quality (1) Water Supply (1) Waterproofing (1) weld failure (1) Well Foundation (1) Winter Precautions (1) Workability of Concrete (1) Working of Contractors (2) works (9) कार्य एवं उद्देश्य (1) ट्रैक रिकॉर्डिंग तथा दोलन लेखी कार (1) रेल पथ मेट के कर्तव्य (1)