Initial & Final Setting time of Concrete - Short Note

Initial & final setting time of concrete

Initial setting time:- initial setting time is that time period between the time water is added to cement and time  at which 1 mm square section needle fails to penetrate the cement paste, placed in the vicar’s mould 5 mm to 7 mm from the bottom of the mould. Normally initial setting time of cement is 30 minutes.

Final setting time :- Final setting time is that period between the time water is added to cement and the time at which 1 mm needle makes an impression on the paste in the mould but 5 mm attachment does not make any impression. Final setting time is 10 hours.



No comments:

Post a Comment

Note: Only a member of this blog may post a comment.

Disclaimer: The Information/News/Video provided in this Platform has been collected from different sources. We Believe that “Knowledge Is Power” and our aim is to create general awareness among people and make them powerful through easily accessible Information. NOTE: We do not take any responsibility of authenticity of Information/News/Videos.