INDEX - ENGINEERING(P WAY) I RLY (ENGLISH)
E01.01 RAILWAY ORGANISATION
E01.02 Duties of Keyman
E01.03 Duties of sectional PWI
E02.01 Permanent Way
E02.02 Handling of 90 UTS rails
E02.03 Defects in Rails
E02.04 Examination of Rails
E03.01 Sleepers & Fastenings - Functions of SleepersE01.02 Duties of Keyman
E01.03 Duties of sectional PWI
E02.01 Permanent Way
E02.02 Handling of 90 UTS rails
E02.03 Defects in Rails
E02.04 Examination of Rails
E03.02 Comparison between Various Types of Sleepers
E03.03 Elastic Fastening
E03.04 Laying of Sleepers
E04.01 Ballast
E04.02 Ballast Profile for L.W.R. track
E04.03 Formation
E04.04 Bridges
E05.01 Points & Crossings: Introduction & Definitions
E05.02 Special Layouts
E05.03 Isolation
E05.04 Maintenance and Inspection of Points and Crossing
E05.05 Reconditioning of Points and Crossing
E06.01 Basics of Curves
E06.02 Realignment of Curve
E07.01 Patrolling
E08.01 Maintenance of Track -Through packing
E08.02 Systematic Overhauling
E08.03 Annual Programme for Regular Track Maintenances
E08.04 Lifting
E08.05 Deep Screening
E08.06 Short Welded Rail
E08.07 Maintenance of SWR
E08.08 ON Track Machines
E08.09 Small Track Machines
E08.10 Level Crossing
E08.11 Equipments at Level Crossing and Duties of Gateman
E08.12 Maintenance / Examination / Inspection of Level Crossing / Gate
E08.13 Height Gauges on Electrified Section
E08.14 Welding of Rails
E08.15 Records of Material under Trial (As per Cs.no 99)
E09.01 Speed Restriction and Indicators
E09.02 Safe Working of Contractors (As per Cs.No 95)
E09.03 Works Requiring CRS Sanction
E10.01 Inspection of Track - Object of Inspection
E10.02 Riding Quality and Riding Index
E10.03 Track Recording and Oscillograph Car
E10.04 CTR and TGI Value
E11.01 RENEWAL - Permanent Way Renewal
E11.02 Laying of Sleepers
E12.01 Accidents& Breaches - Accidents
E12.02 Breaches
E12.03 Diversion
E13.01 Maintenance in Electrified Area
E13.01 Maintenance in Track Circuited / Electrified Area
E14.01 Long Welded Rail - Definitions
E14.02 Permitted locations for LWR/CWR
E14.03 Destressing of LWR
E14.04 Maintenance of LWR / CWR
E14.05 DOs and Don’ts OF LWR For PWM
in-charge PWI and ADEN
INDEX
Lowering of Track and Creep
Mate
Mates & Keyman
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.